Contacts

92 Bowery St., NY 10013

+1 800 123 456 789

We Help around the world

Introduse Our Campains

P1. Parents Waiting Area (30 ft x 20 ft)

ROOF CANOPY WORK.CEILING WORK.ELECTRICAL WORK.PLASTER WORK.FLOOR CONCRETE AND RENDERING.LANDSKEEPING WORK.PAINT WORK.SUPPLY AND FIXING OF BENCH. Challenge In egestas erat imperdiet sed. Vestibulum lectus mauris ultrices eros. Gravida dictum fusce ut placerat...

P2. Parking Area & Returning Wall (30 ft x 30ft)

CMEMNT BLOCK WORK.PLASTER WORK.ELECTRICAL WORK.PAINT WORK.LANDSKEEPING & FLOOR INTER LOCK WORK.BIKE PARKING HUT.ESTIMATED COST – 2,500,000/= Challenge In egestas erat imperdiet sed. Vestibulum lectus mauris ultrices eros. Gravida dictum fusce ut placerat...

P3. Front Gate (12ft x 6ft)

CMEMNT BLOCK WORK.PLASTER WORK.ELECTRICAL WORK.PAINT WORK.LANDSKEEPING & FLOOR INTER LOCK WORK.BIKE PARKING HUT.ESTIMATED COST – 2,500,000/= Challenge In egestas erat imperdiet sed. Vestibulum lectus mauris ultrices eros. Gravida dictum fusce ut placerat...

P4. Front Parapet Wall Renovation

DEMOLISH EXISTING WALL AND BUILD NEW WALLREPAIR EXISTING STAIRES.LANDSKEEPING WORK.PAINT WORK.CONSTRUCT OF NATIONAL FLAG AREA.ESTIMATED COST – 800,000/= Challenge In egestas erat imperdiet sed. Vestibulum lectus mauris ultrices eros. Gravida dictum fusce ut...

P5. Old Office Building Renovation (110 ft x 20ft)

REMOVE EXSTING FLOOR CONCRETE & RENDERING.RELAY FLOOR CONCRETE & RENDERING ON FLOOR.WALL PETCHES.ELECTRICAL REPAIR.DRAIN REPAIR.ROOF REPAIR REPLACE WITH NEW ASBESTOS SHEETCEILING WORKPAINT WORK.DOOR & WINDOW REPAIR.ESTIMATED COST – 3,250,000/=...

P6. Old Primary Building Renovation (70ft x 30ft)

REMOVE EXSTING FLOOR CONCRETE & RENDERING.RELAY FLOOR CONCRETE & RENDERING ON FLOOR.WALL PETCHES.ELECTRICAL REPAIR.DRAIN REPAIR.ROOF REPAIR REPLACE WITH NEW ASBESTOS SHEET.CEILING WORK.PAINT WORK.DOOR & WINDOW REPAIR.ESTIMATED COST – 2,700,000/=...